Municipal Water Plant Upgrade
Complete fabrication and installation of 304L stainless steel piping for a new filtration skid.
Challenge
The primary challenge was the limited window for installation. The municipal water supply could only be interrupted for a maximum of 48 hours before reserve tanks were depleted.
Solution
We prefabricated 85% of the piping spools in our shop, verifying fit-up with laser scanning technology. On-site work was executed by two 12-hour shift crews to ensure continuous progress.